Nexus FactoryNexus Factory

Manufacturing software for

Built for the floor, trusted by the office. Know where every order is, every minute of the day.

Trusted by 140+ SMB manufacturers
Features

Everything a small factory needs, nothing it doesn't.

The essentials for running a plant, modelled correctly out of the box. BOMs, GRNs, job cards, lots and stages all in the vocabulary your shop floor already uses.

Stage-wise production

Model any process as stages like moulding, trimming, QA and packing, with one-tap confirmations on the floor.

Shift A · Line 02Live
94.2%▲ 1.8
First-pass yield
68s▼ 4
Avg cycle time
316/400
Target met
Throughput / hr42u
06:0010:0014:00now
Moulding
120
units · active
Trimming
86
in progress
QA
62
awaiting check
Packing
48
queued
Done
-
0 shipped

Lot & batch with FEFO

Every unit tracked by lot, with first-expiry-first-out allocation running automatically during picking.

ok
LOT-A8412
exp 04/28/26
420 kg
soon
LOT-A8399
exp 04/22/26
260 kg
quarantine
LOT-A8376
failed QA
60 kg

Quality, built in

Inspection checklists, rework routes and pass-rate KPIs live right beside production, not in a separate module.

Flash trim < 0.3 mmQA-01
Weight 42 ± 0.5 gQA-02
Visual colour matchQA-03

Reports out of the box

Ship with 40+ pre-built reports covering yield, scrap and on-time delivery, exportable to PDF or Excel in one click.

OutputDefectsWeek 14 · 95.2% pass

Role-based, multi-plant

Operators, plant managers and owners each see only what they need, and can switch plants with a keystroke.

AI
Acme Injection
Chennai · 84 operators
active
KM
Kairos Metal
Pune · 41 operators
switch
How it works

Order in. Carton out. One record of truth.

A structured rollout from your first sales order to a packed carton, modelled around the vocabulary your shop floor already uses.

Step 01

Sales order

  • Take orders from email, WhatsApp or portal.
  • Create an SO in 20 seconds.
  • Stock allocation runs automatically.
SO-2408pending
Widget-240 · Black1,240
Gasket-R8480
Customer: Acme · Due 4/24
Step 02

Procure & receive

  • One-click PO for missing raw material.
  • GRN on arrival posts stock to the ledger.
  • Every lot traced from day one.
GRN-1194received
PP Granule · Natural800 kg
Colourant MB-4124 kg
Supplier: Reliance · LOT-A8412
Step 03

Produce

  • Job card issued to the work centre.
  • Operators confirm each stage with a tap.
  • Output, scrap and hours logged live.
JOB-5521production
Moulding · M-04120 / 120
Trimming · WC-0286 / 120
Operator: Ravi K. · Shift A
Step 04

QA, pack, dispatch

  • Passed lots packed, labelled, marked done.
  • Customer gets an auto dispatch email.
  • Full audit trail attached to the SO.
SO-2408done
Packed · carton62 / 62
Dispatched4/24 · 2:14 PM
Audit log · 38 events · PDF export
Pricing

One flat software price. Implementation, priced to fit.

A single software plan with every feature included, plus a 90-day white-glove implementation quoted to your plant.

Implementation
90-day programme

White-glove setup

Custom
Scoped case-by-case to your plant.

We run the rollout end-to-end, from discovery to hand-off.

Delivered in 90 days · fixed timeline, variable scope
  • Discovery workshop
  • On-site factory visit
  • Process & stage mapping
  • Data migration from your current system
  • BOMs configured
  • Quality checklists set up
  • Work-centres & roles configured
  • Shop-floor operator training
  • Manager & owner onboarding
  • Go-live support on the floor
  • 30-day post-launch hyper-care
  • Formal hand-off & runbook
Priced by plant size and scope.
Implementation timeline

From kick-off to hand-off in 90 days.

A fixed 5-stage programme run by our implementation team. Every project follows the same spine. Scope and effort flex to your plant.

Step 01
Discovery
Day 1–10 · 10 days

Process mapping, stakeholder interviews, scope lock.

Step 02
Factory visit
Day 11–17 · 1 week

On-site shop-floor walkthrough, operator shadowing, work-centre layout.

Step 03
Data collection & migration
Day 18–45 · 4 weeks

Products, BOMs, customers, suppliers, opening inventory, loaded & reconciled.

Step 04
Implementation & testing
Day 46–75 · 4 weeks

Stages, checklists & roles configured. UAT with a pilot line before factory-wide cut-over.

Step 05
Hand-off & maintenance
Day 76–90 · 2 weeks

Operator training, go-live, 15-day hyper-care, transition to support.

Ready to plan your 90-day rollout?

A 30-minute discovery call to scope your plant. No commitment, no sales pitch.

About

Built for small factories that outgrew spreadsheets.

Based in Bengaluru, we build the MRP we couldn't find: opinionated, correct, and invisible enough that an operator can do their job without ever reading a manual.

140+
Plants on Nexus
90 days
Fixed implementation
99.98%
Uptime, trailing 12 mo.
From the CEO

Small factories are the backbone of Indian manufacturing, and they deserve software that respects their scale: fast to set up, easy on the floor, and honest about what it does.

Vinayaka Nataraj
CEO & Founder, Nexus Factory
Get started

Talk to our team about your rollout.

Every implementation starts with a discovery call. Share your plant size, processes and current systems; we'll scope a 90-day programme for you.

90-day rollout at a glance
DiscoveryDay 1–10
Factory visitDay 11–17
Data migrationDay 18–45
Implementation & testingDay 46–75
Hand-off & go-liveDay 76–90